Almaraz NPP (UI-UII)
OWNERS
Iberdrola Generación Nuclear, S.A.U. (52,687%)
Endesa Generación, S.A.U. (36,021%)
Gas Natural Fenosa Generación, S.L.U. (11,292%)
Endesa Generación, S.A.U. (36,021%)
Gas Natural Fenosa Generación, S.L.U. (11,292%)
LOCATION
Almaraz (Cáceres)
TECHNICAL SPECIFICATION
Reactor Type: Pressurized Water Reactor (PWR)
Supplier: Westinghouse
Thermal Power: 2.947 MWt (U-I) - 2.947 MWt (U-II)
Fuel: Enriched Uranium Dioxide (UO2)
No. of fuel elements: 157
Gross Electrical Output: 1.049,43 MWe (U-I) - 1.044,45 MWe (U-II)
Net Electrical Output: 1.011,30 MWe (U-I) - 1.005,83 MWe (U-II)
Cooling: Open Circuit. Arrocampo Reservoir
Supplier: Westinghouse
Thermal Power: 2.947 MWt (U-I) - 2.947 MWt (U-II)
Fuel: Enriched Uranium Dioxide (UO2)
No. of fuel elements: 157
Gross Electrical Output: 1.049,43 MWe (U-I) - 1.044,45 MWe (U-II)
Net Electrical Output: 1.011,30 MWe (U-I) - 1.005,83 MWe (U-II)
Cooling: Open Circuit. Arrocampo Reservoir
Commencement of Commercial Operations
1 September, 1983 (UI) - 1 July, 1984 (U-II)
Current Operational Authorisation
08/06/2010 for a period of 10 years
Cycle Duration
18 months both units
C.N. Trillo
OWNERS
Iberdrola Generación Nuclear, S.A.U. (48%)
Gas Natural Fenosa Generación, S.L.U. (34,5%)
Iberenergía, S.A.U. (15,5%)
Nuclenor, S.A. (2%)
Gas Natural Fenosa Generación, S.L.U. (34,5%)
Iberenergía, S.A.U. (15,5%)
Nuclenor, S.A. (2%)
LOCATION
Trillo (Guadalajara)
TECHNICAL SPECIFICATION
Reactor Type: Pressurized Water Reactor (PWR)
Supplier: KWU
Thermal Power: 3.010 MWt
Fuel: Enriched Uranium Dioxide (UO2)
No. of fuel elements: 177
Gross Electrical Output: 1,066 MWe
Net Electrical Output: 1,003 MWe
Cooling: Natural Draft Towers (Tajo River)
Supplier: KWU
Thermal Power: 3.010 MWt
Fuel: Enriched Uranium Dioxide (UO2)
No. of fuel elements: 177
Gross Electrical Output: 1,066 MWe
Net Electrical Output: 1,003 MWe
Cooling: Natural Draft Towers (Tajo River)
Commencement of Commercial Operations
6 August, 1988
Current Operational Authorisation
17/11/2014 for a period of 10 years
Cycle Duration
12 months