CNAT

english Almaraz NPP (UI-UII)

OWNERS

Iberdrola Generación Nuclear, S.A.U. (52,687%)
Endesa Generación, S.A.U. (36,021%)
Gas Natural Fenosa Generación, S.L.U. (11,292%)

LOCATION

Almaraz (Cáceres)

TECHNICAL SPECIFICATION

Reactor Type: Pressurized Water Reactor (PWR)
Supplier: Westinghouse
Thermal Power: 2.947 MWt (U-I) - 2.947 MWt (U-II)
Fuel: Enriched Uranium Dioxide (UO2)
No. of fuel elements: 157
Gross Electrical Output: 1.049,43 MWe (U-I) - 1.044,45 MWe (U-II)
Net Electrical Output: 1.011,30 MWe (U-I) - 1.005,83 MWe (U-II)
Cooling: Open Circuit. Arrocampo Reservoir

Commencement of Commercial Operations

1 September, 1983 (UI) - 1 July, 1984 (U-II)

Current Operational Authorisation

08/06/2010 for a period of 10 years

Cycle Duration

18 months both units

english C.N. Trillo

OWNERS

Iberdrola Generación Nuclear, S.A.U. (48%)
Gas Natural Fenosa Generación, S.L.U. (34,5%)
Iberenergía, S.A.U. (15,5%)
Nuclenor, S.A. (2%)

LOCATION

Trillo (Guadalajara)

TECHNICAL SPECIFICATION

Reactor Type: Pressurized Water Reactor (PWR)
Supplier: KWU
Thermal Power: 3.010 MWt
Fuel: Enriched Uranium Dioxide (UO2)
No. of fuel elements: 177
Gross Electrical Output: 1,066 MWe
Net Electrical Output: 1,003 MWe
Cooling: Natural Draft Towers (Tajo River)

Commencement of Commercial Operations

6 August, 1988

Current Operational Authorisation

17/11/2014 for a period of 10 years

Cycle Duration

12 months